New construction of University Hospital K2, Basel
Automatic excavation pit and building monitoring
The new construction of Clinic 2 at Basel University Hospital comprises a 60-meter-high ward tower, which will be directly connected to the existing Clinic 2 building. The project is located right in the heart of Basel.
The excavation pit for the five basement floors is located directly between the existing Clinic K2 building and the listed Markgräflerhof building. To the northwest, the excavation pit connects to the OP-Ost operating theater building and the MTA building. Due to the depth of the excavation pit and the infrastructure in the immediate vicinity, the buildings and the excavation pit itself are being closely monitored. Terradata is providing various services in the field of measurement sensor technology, together with its local monitoring partner Jermann Ingenieure+Geometer.
Link to the current construction status: Webcam
Services
- Automatic settlement measurements with hose level systems in the surrounding existing buildings with a total length of several hundred meters
- Automatic geotechnical monitoring of the excavation pit with in-place inclinometers, anchor force measurements, flat presses, and extensometers
- Visualization of all measurement data on the TEDAMOS web portal, including automatic alarms
Technologies
- Hose balance measuring system with 35 sensors
- 17 in-place inclinometers
- 30 anchor force measurements
- 14 6-way extensometers
- Pressure monitoring for flat presses
- TEDAMOS Web, password-protected customer portal with 24/7 access
More reference projects
New construction of University Hospital K2, Basel
Basel, Switzerland
Automatic excavation pit and building monitoring
Long-term monitoring Riedberg Tunnel
Gampel, Switzerland
Automatic and manual tunnel and terrain monitoring measurements
GNSS Monitoring Kilchenstock
Glarus, Switzerland
Monitoring of terrain displacement with autonomous GNSS stations
Renovation of the Palace Hotel, Luzern
Luzern, Switzerland
Automatic height monitoring with hose levelling and tachymeter