New building rehabilitation clinic Bellikon

Construction surveying, manual and automatic monitoring

Project: 2014 - 2017, Bellikon, Switzerland
Client: GROSS Generalunternehmung AG

For capacity reasons, the rehabilitation clinic in Bellikon, Switzerland's leading clinic for accident rehabilitation, has decided to carry out a complete renovation of the existing clinic site and to build a new building. The additional space and uses will be accommodated in a three-storey new building in front of the clinic. The total costs amount to CHF 316 million.

The existing wards were monitored using automatic and manual measurements in order to identify potential risks at an early stage and to be able to take countermeasures. In addition, the construction required extensive surveying, staking out and construction inspections.

Services

  • Creation of a highly accurate fixed-point network and expansion
  • inventories for detailed planning
  • Stake-out and control surveys
  • Setting out of construction targets
  • Installation and operation of 3 total station monitoring systems (façade and interior of building)
  • Installation and operation of 4 permanent vibration sensors in accordance with SN 640'312
  • Manual inclinometer and anchor force and geodetic deformation measurements
  • Manual and automatic crackmeters

Technologies

  • 3 precision total stations with 65 monitoring points
  • 4 vibration sensors
  • 2 automatic crack measurement systems (crackmeters)
  • 3 webcams
  • TEDAMOS Web, password-protected customer portal with 24/7 access
Projects

More reference projects

New building rehabilitation clinic Bellikon

GROSS Generalunternehmung AG, 2014 - 2017
Bellikon, Switzerland

Construction surveying, manual and automatic monitoring

Learn more
Bellikon
Parco Verde

Parco Verde, Schübelbach

Mächler Generalunternehmung AG, 2022 - 2023
Schübelbach, Switzerland

Automatic, image-based as-built site documentation with CraneCam

Learn more
GNSS Kilchenstock

GNSS Monitoring Kilchenstock

Glarus South municipality, 2017 - ...
Glarus, Switzerland

Monitoring of terrain displacement with autonomous GNSS stations

Learn more
Gubrist 3. Röhre

New construction 3rd tube of the Gubrist tunnel, Zurich

FEDRO Swiss Federal Roads Office, 2016 - 2022
Zurich, Switzerland

Monitoring during construction with geodetic, geotechnical and environmental sensors, as well as manual control measurements

Learn more