The former Zwicky site in Wallisellen is being redesigned. The “Waldhaus NeuGuet” is a 50-meter-high residential tower with 98 condominiums in a new neighborhood. The Zwicky site is surrounded by several sensitive buildings. Among other things, the bridge piers of the SBB viaduct and the excavation pit closures must be closely monitored. A multi-sensor system consisting of a total station, a chain inclinometer, and anchor force measuring cells is used for monitoring. In addition, manual settlement measurements are carried out.
Services
- Permanent 3D monitoring measurements of bridge piers and excavation pit closures
- Installation and operation of a 1-total station monitoring system
- Installation and operation of 2 automatic vertical chain inclinometers, each with 10 sensors
- Installation and operation of 12 automatic anchor force measuring devices
- Manual settlement measurements on surrounding objects
- Alarm system when limit values are exceeded
- Project in collaboration with Gossweiler AG
- All recorded data is documented in TEDAMOS Web, our password-protected customer portal with 24/7 access.
Technologies
- 1 precision total station with 30 monitoring points
- 2 automatic chain inclinometers, each with 10 sensors
- 12 automatic anchor force measuring devices
More reference projects
Excavation pit monitoring at the Zwicky site in Wallisellen
Wallisellen, Switzerland
Continuous measurement monitoring of the Waldhaus NeuGuet construction site
Renovation of the Palace Hotel, Luzern
Luzern, Switzerland
Automatic height monitoring with hose levelling and tachymeter
Construction project LUX, Schindellegi
Schindellegi, Switzerland
Automatic and manual monitoring measurements
Brauipark, Affoltern a.A.
Affoltern am Albis, Switzerland
Comprehensive construction site documentation and monitoring